Live Edge Furniture, Kiln
Dried Wood Slabs and Firewood

What We Have In Stock

As you go down the list the further along the process goes. Top is raw material, bottom being furniture ready to install.

Logs x 3
Logs x2  drying for 1-8 Months Cherry logs
Oak Slabs x 7
Oak Slabs x 4. drying as slabs for 8-12 months 
Unique Pile x 7.  drying 8-16 months. Tulip and Maple – Circular and short, wide pieces
Cedar Slabs x 9. drying as slabs for 6-12 months 
Cedar Slabs x 3. drying as slabs for 6-12 months.
Tulip – out of kiln. Air dried 8-10 months, kiln dried 1-2 months x 8
Maple slabs x 5 • Air dried and kiln dried
Maple slabs x 3 • Air dried, kiln dried, flattened and sanded
– FURNITURE –